Layout for array

I laid out the array footprint on the ground so I could determine where the 12 poles were going and also identify the sewage pipe that needed to be moved. Of course it was directly in line with four of the holes that needed to be dug.

I laid out the array footprint on the ground so I could determine where the 12 poles were going and also identify the sewage pipe that needed to be moved. Of course it was directly in line with four of the holes that needed to be dug.